Loading...
Loading...
জল জীবন মিশন (JJM) – হর ঘর জল
Complete step-by-step application guide for Jal Jeevan Mission (JJM) – Har Ghar Jal (জল জীবন মিশন (JJM) – হর ঘর জল), covering eligibility snapshot, mandatory documentation, submission procedures, and official portal links.
Identification proof establishing residence within the Gram Panchayat village jurisdiction.
Identity document for household verification on the national JJM MIS database.
Inclusion of the household in the Village Water & Sanitation baseline survey register.
Visit your local Gram Panchayat or Paani Samiti to check the ongoing piped water scheme schedule for your habitation.
Public Health Engineering Department (PHED) engineers survey the village, map houses, and lay distribution mains.
Trained plumbers connect the household line to the street water main and install a functional standpost/tap inside the premises.
The system is tested for 55 lpcd flow pressure, disinfected with chlorine, and regular daily water supply commences.
In case of pipeline leakage, low pressure, or turbidity, report to the local Paani Samiti or State PHED grievance portal.
Following submission, your application and submitted documents are verified by the designated block or department officials. Processing typically completes within 15 to 30 working days.
Offline Submission Center: Duare Sarkar Camp / BDO Office / Municipality Office