Loading...
Loading...
জল স্বপ্ন
Complete step-by-step application guide for Jal Swapno (জল স্বপ্ন), covering eligibility snapshot, mandatory documentation, submission procedures, and official portal links.
Document verifying household location in the covered village/mouza under the water scheme.
Identity proof for household record verification during pipeline survey.
Proof of residential property if requested by the local implementing authority.
Check whether your village/gram panchayat is included in an approved Jal Swapno / JJM piped water project on maps.wbphed.gov.in or at the local Gram Panchayat office.
PHED implementing agencies and Village Water & Sanitation Committees (VWSC) conduct household surveys to map tap points.
Laying of distribution pipelines, construction of overhead reservoirs (OHR), pumping stations, and water treatment units.
Plumbing connection branch is laid from the main distribution pipeline into the domestic premises, terminating at a functional tap.
Water pressure, chlorination, and purity tests are conducted before regular scheduled drinking water supply commences.
Following submission, your application and submitted documents are verified by the designated block or department officials. Processing typically completes within 15 to 30 working days.
Offline Submission Center: Duare Sarkar Camp / BDO Office / Municipality Office